The Town of Westlock will close the intersection between 103A ave and 107A ave from June fifth to the seventh for essential underground infrastructure repairs as part of their rehabilitation program.
The 107A ave rehabilitation program has entered phase two of this multi-year plan that is expected to be done by this September. The upgrade includes a new watermain and sanitary sewermain that includes new services that link to their respective property lines. It is accompanied by new road structures, asphalt surface and a concrete sidewalk with rolled face curb.
Residents should be aware that they will not have access to the front of their streets during this time and will need to use the alley for parking. Residents will receive a temporary water service interruption notice for any time water will not be available during phase two.